In 2010, a new era started with the year´s summer timetable among RhB´s rolling stock: the first 15 copies of the three-part “Allegra” dual-voltage railcars, ordered from Stadler, replaced some of the locomotives which had seen better days.
The powerful and air-conditioned ABe 4/8 3501-3515 can be either used on the main line´s AC system or the DC-powered “Bernina” line.
With further procurements, the operational concept of locomotive-drawn trains has changed with the exception of the Albula line and “GEX” trains in favour of a mainly covering by multi-part new built railcars.